The brief :- Capture the creation of two new Linkspans for Coll & Tiree during construction / fabrication right up to their departure ready for installation late 2019 early 2020.

Drone footage and ground footage both inside the factory during fabrication with more to capture the move from inside, out towards the canal pickup point. More footage then captured of the lift onto the crane barge and the early stages of the float down the canal.

End result :-  1) Short Instagram Marketing Video 2) a longer client video 3) Images for social media use.

CDFmedia

Leave a Reply

Your email address will not be published. Required fields are marked *